Work out the concrete volume
Enter columns, beams, footings, slabs and piles line by line, take voids off with deduction lines and see the total concrete volume in m³. No sign-up.
Concrete volume sheet
Pick each member's type and enter its measures in metres. Put deductions such as a slab opening on a line of their own, marked as a deduction.
Enter the measures of the first line, or try the sample data.
How the concrete volume is found
Each line's volume follows its member type's formula, times similar and count; deduction lines count negative.
Prism = similar × count × length × width × height
Cylinder = similar × count × π/4 × diameter² × height
Slab = similar × count × length × width × thickness
Measures are in metres, a pile's or round column's diameter too. π is taken to forty decimals.
Rules
- Prismatic members
- Columns, beams, footings and walls of rectangular section are measured length × width × height.
- Piles and round columns
- A cylinder's volume is π/4 × diameter² × height. For a pile, the length is the one the item description sets.
- Slab
- A slab is measured length × width × thickness. Stair and shaft openings go in as deduction lines if the item description deducts them.
- No rounding along the way
- Lines and total are worked out with exact values; only the figure on screen is rounded: m, m², m³ and kg to 3 decimals, tonnes to 6. A copied value carries 8 decimals. A quantity rounded along the way leaves a gap that turns into money once multiplied by the unit price.
- Deduction lines
- Each thing to deduct goes on its own line, marked as a deduction; the sheet counts it negative. If the deductions exceed what was added, no total is given.
- Measurement rules come from the item description
- The "Measurement" clause of the item description and the technical specification decide which voids are deducted and how intersections are measured. The tool applies no void threshold and deducts no intersection by itself.
- Copying for Excel
- The sheet is copied with its header, lines and total as tab-separated text. Numbers use the page's decimal mark and no thousands separator; deductions carry a minus sign.
What this tool does not cover
It does not decide which member an intersection's volume belongs to; the item description and the technical specification do.
It does not apply the item description's measurement clauses by itself, read quantities from drawings (DWG, IFC), or multiply quantities by unit prices into amounts.
About concrete takeoffs
- Price IndicesDomestic PPI sub-indices and CPI, monthly tables since 2012.
- Price Adjustment CalculatorPrice adjustment with the official formula, from Domestic PPI and CPI.
- Progress Payment Deductions CalculatorThe cover's VAT, every deduction from a) to k) and the net amount paid to the contractor, on one sheet.
- Index Change CalculatorHow Domestic PPI and CPI moved since your tender month, with the In/Io ratio.
- Work Experience Update CalculatorWhat a work experience certificate counts for in the tender you enter, with the right Domestic PPI months for its kind.
- Stamp Duty CalculatorThe 9.48 per mille stamp duty on a progress payment, with the yearly cap.
- VAT Withholding CalculatorThe VAT withheld on a progress payment, at the communiqué's rate for the work type.
- Withholding Tax CalculatorWithholding tax on a multi-year construction payment, at the rate for the work type and payment month.
- Performance Bond CalculatorThe performance bond on a bid, with the below-limit 9% rule and additional bonds.
- Minimum Labour CalculatorThe minimum labour to declare for the SGK clearance, the shortfall and its estimated premium.
- Advance Payment CalculatorThe advance, its 30% or one-third cap, the recovery rate and what comes off each progress payment.
- Work Increase CalculatorThe work increase room left under the 20% (unit price) or 10% (lump sum) limit.
- Completion Compensation Calculator5% of the shortfall when work ends below 80%, updated to the acceptance month by Domestic PPI.
- Delay Penalty CalculatorThe delay penalty from the first contract price, daily rate and days late, with the 15% cap.
- Work Duration CalculatorCompletion date from the site handover, days late, final acceptance and payment deadlines.
- Fuel PricesEPDK monthly averages by fuel type, for the fuel coefficient of a price adjustment.
Stop carrying concrete takeoffs into payments by hand
Takeoffs are entered by item, approved, and summed into the period's summary on their own.